Installation of Electrical Works in HDB at PASIR RIS Street 51 for Residential Blocks (Block 524C and 525C)
Between 2013 and 2014, we completed the electrical installation works for HDB residential blocks 524C and 525C at Pasir Ris […]
Between 2013 and 2014, we completed the electrical installation works for HDB residential blocks 524C and 525C at Pasir Ris […]
In 2012, we executed the cable installation of electrical works at VOPAK CHANG CHUN, located at Banyan Jurong Island, Singapore.